Figures & Appendices
Figure 1-1 Location Map
Figure 1-2 Site Sketch - August 2005 Conditions
Figure 1-3 Airphoto Duntroon Quarry and Vicinity
Figure 1-4 Expansion Property Existing Features
Figure 2-1 Topography and Surface Drainage
Figure 3-1 Physical Setting Figure 3-1 (a) Satellite Image
Figure 3-2 Regional Geology
Figure 3-3 Cross Sectional Sketch
Figure 3-4 Cross Section Lines
Figure 3-5 Cross Section A-A'
Figure 3-6 Cross Seciton B-B'
Figure 3-7 Overburden Thickness
Figure 3-8 Elevation of Top of Bedrock Surface
Figure 3-9 Thickness of Amabel Formation
Figure 3-10 Elevation of Top of Fossil Hill Formation
Figure 3-11 Thickness of Fossil Hill Formation
Figure 3-12 Elevation of Top of Cabot Head Formation
Figure 3-13 Borehole Hydraulic Conductivity Cross-Section C-C'
Figure 3-14 Borehole Hydraulic Conductivity Cross-Section D-D'
Figure 3-15 Guelph - Amabel Aquifer
Figure 3-16 Bedrock Groundwater Levels June 26, 2003
Figure 3-17 Bedrock Groundwater Levels September 2003
Figure 3-18 Bedrock Groundwater Levels November 2004
Figure 3-19 Bedrock Groundwater Levels April 2005
Figure 3-20 Comparasin of Groundwater Elevation - June 2003, June 2004 and April 2005
Figure 3-21 MOE Water Well Records
Figure 4-1 Surface Water Flows
Figure 5-1 Distance - Drawdown Relationship
Figure 6-1 Operational Plan
Figure 6-2 Cross Section E-E'
Figure 6-3 Cross Section F-F'
Figure 6-4 Cross Section G-G'
Figure 6-5 Cross Section H-H'
Figure 6-6 Rehabilitation Plan
Figure 6-7 Simulated Existing Regional Conditions
Figure 6-8 Simulated Existing Local Conditions
Figure 6-9 Simulated Pre-Extraction Conditions
Figure 6-10 Simulated Drawdown Due to Existing Quarry
Figure 6-11 Simulated Conditions End of Phase 1
Figure 6-12 Simulated Drawdow End of Phase 1 Relative to Existing Conditions
Figure 6-13 Simulated Conditions End of Phase 1 with Mitigation
Figure 6-14 Simulated Drawdown End of Phase 2 Relative to Existing Conditions
Figure 6-15 Simulated Conditions End of Phase 2
Figure 6-16 Simulated Drawdown End of Phase 2 Relative to Existing Conditions
Figure 6-17 Simulated Conditions End of Phase 2 with Mitigation
Figure 6-18 Simulated Drawdown End of Phase 2 with Mitigation
Figure 6-19 Simulated Conditions End of Phase 3 to 500 M ASL
Figure 6-20 Simulated Drawdown End of Phase 3 to 500 M ASL Relative to Existing Conditions
Figure 6-21 Simulated Conditions End of Phase 3 to 500 M ASL with Mitigation
Figure 6-22 Simulated Drawdown End of Phase 3 to 500 M ASL with Mitigation
Figure 6-23 Simulated Conditions End of Quarry Extraction
Figure 6-24 Simulated Drawdown End of Quary Extraction Relative to Existing Conditions
Figure 6-25 Simulated Conditions End of Quarry Extraction with Mitigation
Figure 6-26 Simulated Drawdown End of Quarry Extraction with Mitigation
Figure 6-27 Simulated Conditions Final Rehabilitation
Figure 6-28 Simulated Residual Drawdown Final Rehabilitation Relative to Existing Conditions
Figure 7-1 Proposed Additional Groundwater Monitor Locations
Appendix A Geologic Information
Appendix B Groundwater Information
Appendix C Surface Water Information
Appendix D Climate Data
Appendix E Residential Water Supplies and Ministry of the Environment Water Well Records
Appendix F Groundwater Model
Appendix G Curricula Vitae