|
The
documents and links on this page are published in Portable Document
Format (PDF). You will require the free Adobe Acrobat® Reader to view
them. If you do not have Acrobat, or have an earlier version, click
the image to download a free copy of Adobe Reader.

Planning
Report and Aggregate Resources Act Summary Statement - September 2005
Geological Report and
Level 2 Hydrogeological Assessment - September 2005
Figure 1-1
Location Map
Figure 1-2
Site Sketch - August 2005 Conditions
Figure 1-3
Airphoto Duntroon Quarry and Vicinity
Figure 1-4
Expansion Property Existing Features
Figure 2-1
Topography and Surface Drainage
Figure 3-1
Physical Setting
Figure 3-1
(a) Satellite Image
Figure 3-2
Regional Geology
Figure 3-3
Cross Sectional Sketch
Figure 3-4
Cross Section Lines
Figure 3-5
Cross Section A-A'
Figure 3-6
Cross Seciton B-B'
Figure 3-7
Overburden Thickness
Figure 3-8
Elevation of Top of Bedrock Surface
Figure 3-9
Thickness of Amabel Formation
Figure 3-10
Elevation of Top of Fossil Hill Formation
Figure 3-11
Thickness of Fossil Hill Formation
Figure 3-12
Elevation of Top of Cabot Head Formation
Figure 3-13
Borehole Hydraulic Conductivity Cross-Section C-C'
Figure 3-14
Borehole Hydraulic Conductivity Cross-Section D-D'
Figure 3-15
Guelph - Amabel Aquifer
Figure 3-16
Bedrock Groundwater Levels June 26, 2003
Figure 3-17
Bedrock Groundwater Levels September 2003
Figure 3-18
Bedrock Groundwater Levels November 2004
Figure 3-19
Bedrock Groundwater Levels April 2005
Figure 3-20
Comparasin of Groundwater Elevation - June 2003, June 2004 and April
2005
Figure 3-21
MOE Water Well Records
Figure 4-1
Surface Water Flows
Figure 5-1
Distance - Drawdown Relationship
Figure 6-1
Operational Plan
Figure 6-2
Cross Section E-E'
Figure 6-3
Cross Section F-F'
Figure
6-4 Cross Section G-G'
Figure 6-5
Cross Section H-H'
Figure 6-6
Rehabilitation Plan
Figure 6-7
Simulated Existing Regional Conditions
Figure 6-8
Simulated Existing Local Conditions
Figure 6-9
Simulated Pre-Extraction Conditions
Figure 6-10
Simulated Drawdown Due to Existing Quarry
Figure 6-11
Simulated Conditions End of Phase 1
Figure 6-12
Simulated Drawdow End of Phase 1 Relative to Existing Conditions
Figure 6-13
Simulated Conditions End of Phase 1 with Mitigation
Figure 6-14
Simulated Drawdown End of Phase 2 Relative to Existing Conditions
Figure 6-15 Simulated
Conditions End of Phase 2
Figure 6-16
Simulated Drawdown End of Phase 2 Relative to Existing Conditions
Figure 6-17
Simulated Conditions End of Phase 2 with Mitigation
Figure
6-18 Simulated Drawdown End of Phase 2 with Mitigation
Figure
6-19 Simulated Conditions End of Phase 3 to 500 M ASL
Figure
6-20 Simulated Drawdown End of Phase 3 to 500 M ASL Relative to
Existing Conditions
Figure
6-21 Simulated Conditions End of Phase 3 to 500 M ASL with Mitigation
Figure
6-22 Simulated Drawdown End of Phase 3 to 500 M ASL with Mitigation
Figure
6-23 Simulated Conditions End of Quarry Extraction
Figure
6-24 Simulated Drawdown End of Quary Extraction Relative to Existing
Conditions
Figure
6-25 Simulated Conditions End of Quarry Extraction with Mitigation
Figure
6-26 Simulated Drawdown End of Quarry Extraction with Mitigation
Figure
6-27 Simulated Conditions Final Rehabilitation
Figure
6-28 Simulated Residual Drawdown Final Rehabilitation Relative
to Existing Conditions
Figure 7-1
Proposed Additional Groundwater Monitor Locations
Appendix
A Geologic Information
Appendix
B Groundwater Information
Appendix
C Surface Water Information
Appendix
D Climate Data
Appendix
E Residential Water Supplies and Ministry of the Environment Water
Well Records
Appendix
F Groundwater Model
Appendix
G Curricula Vitae
FINAL REPORTS
Archaeological
Assessment - 2005
Blasting
Impact Assessment - 2005
Cultural
Heritage Assessment - 2005
Final
Visual Impact Report September 2005
Sound
Impact Analysis - 2005
Traffic
Impact Study - 2005
MHBC
Planning Report September 2005 - 2005
Agricultural
Impact Assessment
Figure
1 - Proposed Area to be Licensed
Figure 2 - Soil and Soil Capability
Figure
3 - Land Use
Level
2 Natural Environment Assessment Technical Report - 2005
Figure
1 Location of Proposed License Area
Figure
2 Assessment Approach
Figure
3 Regional Overview - Contigous Woodlands
Figure
4 Natural Features Regional Contract
Figure
5 Surficial Drainage and Fisheries Resources
Figure
6 ELC Vegetation Communities
Figure
7 Potential Significant Natural Environmental Features
Figure
8 Proposed Quarry Expansion
Figure
9 Summary of Proposed Mitigation, Rehabilitation and Reforestation
Figure
10 Existing Woodland Features on Georgian-owned Land
Figure
11 Post-Closure Woodland Features on Georgian-owned Land
|