Generally,
a layer base material of 50mm (2") Crusher
Run or Granular "B" is laid and compacted, followed by a
layer of properly compacted 22mm (7/8")
Crusher Run or Granular "A". Most roads are built
to the specifications laid out by Engineers, but generally, one needs
a minimum depth of 300mm of the sub-base material, followed by depth of
150mm of base material.