Summerside, Prince Edward Island
The City of Summerside’s Wastewater Treatment Plant has a conventional primary/secondary treatment. Fournier Presses located in the biosolids area yield biosolids cake at 30% total solids. The Summerside N-Viro® facility has been in operation since January 2008.
The City of Summerside owns and operates the facility under a technology license agreement.
Location
The N-Viro® facility is on the Summerside Wastewater Treatment Plant site. This is a smaller facility serving a population equivalent of approximately 40,000 (12,000 City population and a dairy products operation).
Product
Approximately 4,000 tonnes of Summerside N-Viro Soil® is produced annually.